OAHMP-VAHMR0054-24 / Unit #15232

Posting Date: 11/04/2026
Closing Date: 12/02/26

Location / Service Area: Culpeper County, Virginia 

Brief Project Description / Summary of Work 

 

Interior Stairway 

Install Motion-Activated Stair Lighting  

  • Provide and install battery-powered motion-sensor lighting along the entire length of the interior stairway. 
  • Position lights to illuminate stair treads and improve visibility when navigating the stairs. 
  • Mount lighting along the wooden baseboards adjacent to the stairs. Do not attach lighting or mounting hardware to the wallpaper to prevent damage or peeling, per participant request. 
  • Provide and install all batteries required for operation. 

 

Upstairs Bathroom 

 Install Anti-Slip Flooring Strips 

  • Provide and install anti-slip strips on the bathroom floor in front of the toilet, shower/bathtub, sink, and at the bathroom entrance. 
  • Ensure strips are securely adhered and suitable for use on the existing flooring. 

Replace Toilet 

  • Remove and dispose of existing toilet and replace with an 18″ comfort-height toilet. 
  • Install using manufacturer-recommended hardware and connections. 
  • Ensure toilet is securely installed, level, and fully operational. 

Install Toilet Safety Armrests 

  • Provide and install foldable toilet safety armrests on the newly installed toilet. 
  • Securely install according to manufacturer instructions. 

 

Install Dual Shower Head with Sliding Bar 

  • Remove existing shower head and replace with a dual shower head system with handheld shower head and sliding bar. 
  • Securely mount sliding bar for convenient use by participant. 
  • Verify proper operation and check connections for leaks. 

 

Provide Swivel Sliding Transfer Bench 

  • Field Verify before purchase to ensure the bench is compatible with the existing Jacuzzi bathtub configuration, including the height and width of the tub wall and available bathroom space. 
  • Provide a swivel sliding transfer bench with a rotating seat, backrest, and safety belt to assist with transfers into and out of the existing bathtub. 
  • Assemble and adjust the bench according to manufacturer specifications to ensure safe, stable use. 
  • Product Link (white) 

 

Bedroom 

Provide Bedside Lamp 

  • Provide a touch-operated bedside lamp with adjustable brightness and USB charging capabilities. 
  • Position the lamp within easy reach of the bed. 

 

First Floor Bathroom 

Install Anti-Slip Flooring Strips 

  • Provide and install anti-slip strips on the bathroom floor in front of the toilet, sink, and entrance. 
  • Ensure strips are securely adhered and suitable for use on the existing flooring. 

Replace Existing Toilet 

  • Remove and replace the existing toilet with a comfort-height toilet, approximately 18 inches high. 
  • Include all necessary plumbing connections, hardware, and installation materials. 
  • Ensure the new toilet is securely installed and functioning properly. 

Install Toilet Safety Armrests 

  • Provide and install foldable toilet safety armrests on the newly installed toilet. 
  • Field verify adequate clearance for installation and use. 
  • Securely install according to manufacturer instructions. 
  • If adequate clearance is not available for the armrests, provide and install a 24″ horizontal grab bar on the adjacent wall to provide support during toilet transfers. 
  • Securely anchor grab bar to appropriate structural backing at approximately 33″ above finished floor. 

 

Living Room 

Install Continuous Graspable Handrail 

  • Provide and install a floor-mounted handrail approximately 36–40 inches tall near the existing interior step. 
  • Handrail to be continuous, approximately 1.25 inches in diameter, and securely anchored to appropriate structural supports. 
  • Position handrail to provide support when navigating the step (verify height and position with homeowner prior to installation). 

 

Side Entrance 

Extend Existing Exterior Handrail 

  • Extend the existing handrail at the side entrance from its current endpoint to the siding of the home. 
  • Ensure the extension provides continuous, graspable support when navigating the entrance. 
  • Securely anchor the extension and match the existing handrail configuration where feasible. 

 

 

Contractors interested in submitting a bid may contact the disAbility Resource Center to obtain the project address and schedule a time to visit the site. Site visits are by appointment only and must be coordinated in advance. Inquiries may be emailed to sdavis@cildrc.org. 

 

General Requirements 

  • Verify field conditions and exact quantities; request written approval for any substitutions.
  • Where specific product links are provided in the Scope of Work, contractors must use the exact products referenced in those links unless a written substitution is approved bydRC prior to purchase.
  • All grab bars/rails must support 350 lb+ when properly anchored; coordinate heights per OT input where available.
  • Protect adjacent finishes; clean up daily; provide 1-year workmanship warranty.
  • Work must comply with local building codes and aging-in-place best practices. For pre-1978 homes, EPA Lead-Safe Renovator certification and practices are required for interior work disturbing more than 2sq ft of painted surface.
  • Section 3 Compliance: This project is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968. Contractors and subcontractors are encouraged to make every effort to employ low-income persons and qualified Section 3 residents and to contract with Section 3 business concerns when feasible. Documentation of outreach and hiring efforts may be requested. 

 

How to Apply / Submit a Bid 

Due by the Closing Date:
• Completed bid/cost estimate with materials and labor itemized separately
• Proof of current Virginia contractor license
• Certificate of Insurance
• Lead-Safe and other certifications (if applicable)
• Completed W-9 

Submit Bids or Questions to:
Samantha Davis, CAPS
Program Manager – Older Adult Home Modification Program
disAbility Resource Center
409 Progress St., Fredericksburg, VA 22401
540-373-2559 • 📧 sdavis@cildrc.org 

 

Award Information 

All bids will be reviewed for completeness, qualifications, and compliance with HUD requirements. The contract will be awarded to the bidder whose proposal is determined to be most advantageous to the project, considering price, experience, capacity, and overall responsiveness. Contractors may be contacted for clarification before an award decision is made. Award notifications will be posted and emailed within ten (10) business days of the closing date. 