OAHMP-VAHMR0054-24 / Unit #14846

Posting Date: 10/23/26
Closing Date: 11/17/26

Location / Service Area: King George County, Virginia 

Brief Project Description / Summary of Work 

Exterior – Existing Ramp 

Install Ramp Lighting

  • Provide and install solar-powered lights along the full length of the existing wooden wheelchair ramp. 
  • Position and space lights to illuminate the ramp walking surface and improve visibility during nighttime use. 
  • Secure all fixtures to avoid creating tripping hazards or interfering with ramp use. 

Install Anti-Slip Contrast Strips

  • Provide and install exterior-rated contrast anti-slip strips along the full length of the existing wooden wheelchair ramp. 
  • Ensure strips are securely adhered and suitable for outdoor exposure and foot traffic. 

Ensuite Bathroom 

Install Anti-Slip Strips

  • Provide and install anti-slip strips on the bathroom floor in front of the toilet, shower, sink, bathroom entrance, and shower floor.  
  • Ensure strips are evenly placed and securely adhered to prevent lifting or peeling. 

Install Dual Shower Head with Sliding Bar

  • Remove existing shower head and replace with a dual shower head system with handheld shower head and sliding bar. 
  • Securely mount sliding bar for convenient use by participant. 
  • Verify proper operation and check connections for leaks. 

Replace Toilet

  • Remove and dispose of existing toilet and replace with an 18″ comfort-height toilet. 
  • Install using manufacturer-recommended hardware and connections. 
  • Ensure toilet is securely installed, level, and fully operational. 

Install Toilet Safety Armrests

  • Provide and install foldable toilet safety armrests on the newly installed toilet. 
  • Securely install according to manufacturer instructions. 

Main Bedroom 

Replace Ceiling Fan with Light Fixture

  • Remove and dispose of the existing ceiling fan. 
  • Provide and install a ceiling-mounted light fixture with dimming capability and remote control. 
  • Ensure fixture provides adequate illumination throughout the bedroom. 

Manage Electrical Cords

  • Organize and secure exposed electrical cords to reduce tripping hazards. 
  • Use appropriate cord covers, clips, or cable-management products as needed. 
  • Keep cords clear of primary walking paths. 

Hallway 

Replace Ceiling Light Fixture

  • Remove and dispose of the existing ceiling light fixture. 
  • Provide and install a new dimmable ceiling light fixture to improve hallway visibility. 
  • Ensure the fixture provides adequate illumination throughout the hallway. 

Kitchen  

Install Motion-Activated Cabinet Lighting

  • Provide and install motion-activated lights beneath the upper kitchen cabinets. 
  • Position lights to improve visibility of countertop work surfaces. 

Install Smoke and Carbon Monoxide Detection

  • Provide and install smoke and carbon monoxide detection in the kitchen area. 
  • Verify proper operation upon installation. 

Install Fire Extinguisher

  • Provide and mount one residential fire extinguisher in the kitchen. 
  • Confirm final placement with the participant to ensure it is visible and easily accessible. 

Dining Area 

Replace Ceiling Light Fan

  • Remove and dispose of the existing ceiling light fan. 
  • Provide and install a new ceiling fan with integrated dimmable lighting. 
  • Ensure the fan and light operate properly. 

Hallway Bathroom 

Install Anti-Slip Strips

  • Provide and install anti-slip strips on the bathroom floor in front of the toilet, shower, sink, bathroom entrance, and shower floor.  
  • Ensure strips are evenly placed and securely adhered to prevent lifting or peeling. 

Install Elevated Toilet Seat with Armrests

  • Provide and install an elevated toilet seat with integrated armrests on the existing toilet. 
  • Confirm with participant whether the existing toilet has a round or elongated bowl (believed to be elongated) prior to ordering. 
  • Ensure the elevated seat is compatible with the existing toilet and provides adequate height for safe transfers. 
  • Verify adequate clearance for the dimensions of the armrests. 
  • Securely install according to manufacturer instructions and ensure the seat and armrests are stable during use. 
  • Product link 

 

Contractors interested in submitting a bid may contact the disAbility Resource Center to obtain the project address and schedule a time to visit the site. Site visits are by appointment only and must be coordinated in advance. Inquiries may be emailed to sdavis@cildrc.org. 

 

General Requirements 

  • Verify field conditions and exact quantities; request written approval for any substitutions.
  • Where specific product links are provided in the Scope of Work, contractors must use the exact products referenced in those links unless a written substitution is approved bydRC prior to purchase.
  • All grab bars/rails must support 350 lb+ when properly anchored; coordinate heights per OT input where available.
  • Protect adjacent finishes; clean up daily; provide 1-year workmanship warranty.
  • Work must comply with local building codes and aging-in-place best practices. For pre-1978 homes, EPA Lead-Safe Renovator certification and practices are required.
  • Section 3 Compliance: This project is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968. Contractors and subcontractors are encouraged to make every effort to employ low-income persons and qualified Section 3 residents and to contract with Section 3 business concerns when feasible. Documentation of outreach and hiring efforts may be requested. 

 

How to Apply / Submit a Bid 

Due by the Closing Date:
• Completed bid/cost estimate with materials and labor itemized separately
• Proof of current Virginia contractor license
• Certificate of Insurance
• Lead-Safe and other certifications (if applicable)
• Completed W-9 

Submit Bids or Questions to:
Samantha Davis, CAPS
Program Manager – Older Adult Home Modification Program
disAbility Resource Center
409 Progress St., Fredericksburg, VA 22401
540-373-2559 • 📧 sdavis@cildrc.org 

 

Award Information 

All bids will be reviewed for completeness, qualifications, and compliance with HUD requirements. The contract will be awarded to the bidder whose proposal is determined to be most advantageous to the project, considering price, experience, capacity, and overall responsiveness. Contractors may be contacted for clarification before an award decision is made. Award notifications will be posted and emailed within ten (10) business days of the closing date. 