OAHMP-VAHMR0054-24 / Unit #14801
Posting Date: 10/16/26
Closing Date: 11/09/26
Location / Service Area: Orange County, Virginia
Brief Project Description / Summary of Work
Hallway Bathroom
Install Grab Bar
- Provide and install one 36-inch vertical grab bar on the inside left wall of the bathtub/shower.
- Position grab bar to provide a stable handhold during entry and exit from the bathtub.
- Confirm final placement with participant prior to installation.
- Install blocking or other appropriate reinforcement as needed for secure mounting.
Install Anti-Slip Strips
- Provide and install anti-slip strips on the floor of bathtub/shower.
- Ensure strips are evenly placed and securely adhered to prevent lifting or peeling.
Replace Exhaust Fan/Light
- Remove and replace the existing nonfunctioning bathroom exhaust fan/light combination.
- Verify proper operation of the new light, exhaust fan, and existing wall controls.
- Repair minor electrical connections as necessary for proper operation.
Kitchen
Repair Uneven Floor / Close Floor Access
- Evaluate the existing floor access/trap-door area and surrounding soft or uneven flooring.
- Permanently secure and close the existing floor access opening, as participant no longer requires access at this location.
- Finish flooring as needed to provide a firm, stable, and level walking surface.
- Finished flooring does not need to match the existing flooring exactly; prioritize elimination of the trip hazard and creation of a safe transition.
Side Entrance
Replace Side Storm Door
- Provide and install new storm door sized to fit the existing exterior door opening.
- Existing opening appears to be approximately 36″ x 80″; contractor to field verify dimensions prior to ordering.
- Adjust hardware as needed to allow door to open, close, and latch smoothly.
Install Anti-Slip Stair Treads
- Affix anti slip treads with contrast to the wooden steps at the side entrance.
- Install one tread at each step and position consistently to improve traction and step-edge visibility.
- Product Example
Install Exterior Floodlight
- Provide and install a solar powered, exterior-rated floodlight to illuminate the side entryway and approach.
- Position fixture to provide adequate lighting at the entrance and surrounding walking surface.
- Confirm final fixture placement with participant prior to installation.
- Ensure fixture is securely mounted and fully operational upon completion.
- Product Example
Install Continuous Graspable Handrails
- Provide and install continuous graspable handrails (1¼” diameter) along both sides of entrance steps.
- Securely mount handrails to provide stable support during ascent and descent.
- Ensure handrails are continuous along the full stair run, with returned ends to prevent snagging.
Front Entrance/Porch
Replace Storm Door Actuator with One-Touch Actuator
- Remove and replace the broken storm door actuator/closer.
- Install new one touch actuator to mid door, immediately below door window for easier access by participant.
- Adjust closer and associated hardware so the storm door opens, closes, and remains controlled during use.
- Confirm proper operation with participant upon completion.
- Product Example
Install Exterior Floodlight
- Provide and install a solar powered, exterior-rated floodlight to illuminate the front porch and approach.
- Position fixture to provide adequate lighting at the entrance and surrounding walking surface.
- Confirm final fixture placement with participant prior to installation.
- Ensure fixture is securely mounted and fully operational upon completion.
- Product Example
Pre-1978 Construction / Lead Safety Requirements
This home was constructed prior to 1978 and may contain lead-based paint. Contractor shall complete all work in a manner that maintains compliance with applicable HUD lead safety requirements.
To maintain de minimis levels of paint disturbance, no more than two (2) square feet of painted surface may be disturbed within any individual interior room or space and no more than twenty (20) square feet of painted exterior surface may be disturbed while completing the work described in this scope of work. Contractor shall plan and perform work accordingly to minimize disturbance of painted surfaces.
Any anticipated disturbance exceeding these limits must be reported to the disAbility Resource Center prior to beginning work and may require additional approval, lead-safe work practices, or modification of the scope of work.
Contractors interested in submitting a bid may contact the disAbility Resource Center to obtain the project address and schedule a time to visit the site. Site visits are by appointment only and must be coordinated in advance. Inquiries may be emailed to sdavis@cildrc.org.
General Requirements
- Verify field conditions and exact quantities; request written approval for any substitutions.
- Where specific product links are provided in the Scope of Work, contractors must use the exact products referenced in those links unless a written substitution is approved bydRC prior to purchase.
- All grab bars/rails must support 350 lb+ when properly anchored; coordinate heights per OT input where available.
- Protect adjacent finishes; clean up daily; provide 1-year workmanship warranty.
- Work must comply with local building codes and aging-in-place best practices. For pre-1978 homes, EPA Lead-Safe Renovator certification and practices are required.
- Section 3 Compliance: This project is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968. Contractors and subcontractors are encouraged to make every effort to employ low-income persons and qualified Section 3 residents and to contract with Section 3 business concerns when feasible. Documentation of outreach and hiring efforts may be requested.
How to Apply / Submit a Bid
Due by the Closing Date:
• Completed bid/cost estimate with materials and labor itemized separately
• Proof of current Virginia contractor license
• Certificate of Insurance
• Lead-Safe and other certifications (if applicable)
• Completed W-9
Submit Bids or Questions to:
Samantha Davis, CAPS
Program Manager – Older Adult Home Modification Program
disAbility Resource Center
409 Progress St., Fredericksburg, VA 22401
540-373-2559 • sdavis@cildrc.org
Award Information
All bids will be reviewed for completeness, qualifications, and compliance with HUD requirements. The contract will be awarded to the bidder whose proposal is determined to be most advantageous to the project, considering price, experience, capacity, and overall responsiveness. Contractors may be contacted for clarification before an award decision is made. Award notifications will be posted and emailed within ten (10) business days of the closing date.
No comment yet, add your voice below!