OAHMP-VAHMR0054-24 / Unit #14725
Posting Date: 11/04/2026
Closing Date: 12/02/26
Location / Service Area: Stafford County, Virginia
Brief Project Description / Summary of Work
Ensuite Bathroom
Replace Showerhead
- Remove and dispose of the existing showerhead.
- Provide and install the specified chrome dual showerhead system with fixed and handheld showerheads and adjustable slide bar (product link).
- Finish to match existing fixtures.
- Position the handheld showerhead and slide bar for safe and convenient use while seated on the existing shower chair.
- Verify proper operation and check all connections for leaks after installation.
Install Vertical Grab Bar – Shower Entrance
- Provide and install one 24-inch chrome vertical grab bar on the left/wet wall at the shower entrance.
- Mount with the bottom of the grab bar approximately 33 inches above the finished floor.
- Securely mount to appropriate structural backing in accordance with manufacturer installation requirements.
Install Horizontal Grab Bar – Inner Shower Wall
- Provide and install one 24-inch chrome horizontal grab bar on the inner shower wall adjacent to the existing shower chair.
- Mount at approximately 33 inches above the finished floor.
- Securely mount to appropriate structural backing in accordance with manufacturer installation requirements.
Install Horizontal Grab Bar – Wet Wall (Below Shower Control)
- Provide and install one 24-inch chrome horizontal grab bar on the shower wet wall, below the existing shower control.
- Securely mount to appropriate structural backing in accordance with manufacturer installation requirements.
Install Dual Grab Bar with Towel Holder
- Provide and install a 17” chrome dual grab bar with towel holder on the wall across from the toilet to provide support during toilet transfers (product link).
- Mount at approximately 33 inches above the finished floor.
- Securely mount to appropriate structural backing in accordance with manufacturer installation requirements.
- Installation is contingent upon the new grab bar being positioned to fully conceal the existing towel bar mounting holes without requiring wall repairs or painting.
- If the new grab bar cannot be safely installed while concealing the existing mounting holes, leave the existing towel bar in place and do not proceed with this modification.
- Color match existing towel rack.
Install Anti-Slip Strips
- Provide and install the specified anti-slip strips (example product link).
- Apply strips to the bathroom floor in front of the toilet, shower, sink, and bathroom entrance, as well as to the shower floor.
- Install in accordance with manufacturer instructions to ensure strips are securely adhered to applicable surfaces.
Install Toilet Seat Foldable Armrest
- Provide and install a toilet-mounted armrest with foldable support arms (product link)
- Install securely in accordance with manufacturer instructions.
Hallway Bathroom
Install Vertical Grab Bar at Shower Entrance
- Provide and install one 24-inch chrome vertical grab bar at the shower entrance, near the wet wall.
- Mount the grab bar with the bottom approximately 33 inches above the finished floor.
- Securely mount to appropriate structural backing in accordance with manufacturer installation requirements.
Install Horizontal Grab Bar – Wet Wall
- Provide and install one 24-inch chrome horizontal grab bar on the shower wet wall.
- Mount the grab bar approximately 6–12 inches above the shower control.
- Securely mount to appropriate structural backing in accordance with manufacturer installation requirements.
Install Horizontal Grab Bar – Inner Shower Wall
- Provide and install one 24-inch chrome horizontal grab bar on the inner shower wall.
- Mount the grab bar approximately 6–12 inches above the existing soap holder.
- Securely mount to appropriate structural backing in accordance with manufacturer installation requirements.
Install Dual Grab Bar with Towel Holder
- Provide and install one 17-inch chrome dual grab bar with towel holder on the wall across from the toilet (product link).
- Mount at approximately 33 inches above the finished floor.
- Securely mount to appropriate structural backing in accordance with manufacturer installation requirements.
Replace Showerhead
- Remove and dispose of the existing showerhead.
- Provide and install the specified chrome dual showerhead system with fixed and handheld showerheads and adjustable slide bar (product link).
- Position the showerhead and slide bar so they do not interfere with the newly installed horizontal grab bar on the wet wall.
- Verify proper operation and check all connections for leaks after installation.
Install Anti-Slip Strips
- Provide and install the specified anti-slip strips (example product link).
- Apply strips to the bathroom floor in front of the toilet, shower, sink, and bathroom entrance, as well as to the shower floor.
- Install in accordance with manufacturer instructions to ensure strips are securely adhered to applicable surfaces.
Install Toilet Seat Foldable Armrest
- Provide and install the specified toilet-mounted armrest with foldable support arms to provide additional stability and support during toilet transfers (product link).
- Install securely in accordance with manufacturer instructions.
Garage
Install Vertical Grab Bar – Garage Entrance
- Provide and install one 24-inch chrome vertical peened grab bar on the garage-side wall immediately to the right of the door leading from the garage into the home.
- Mount with the bottom of the grab bar approximately 33 inches above the finished floor.
- Securely mount to appropriate structural backing in accordance with manufacturer installation requirements.
Living Room
Install Ring Pan-Tilt Indoor Camera
- Provide and install one Ring Pan-Tilt Indoor Camera in the living room (product link).
- Confirm final camera placement with the participant prior to installation.
- Install and configure the camera in accordance with manufacturer instructions.
Install Ring Chime
- Provide and install one Ring Chime near the participant’s bedroom or at another location selected by the participant to provide amplified Ring doorbell notifications (product link).
- Install and configure the Ring Chime in accordance with manufacturer instructions.
Contractors interested in submitting a bid may contact the disAbility Resource Center to obtain the project address and schedule a time to visit the site. Site visits are by appointment only and must be coordinated in advance. Inquiries may be emailed to sdavis@cildrc.org.
General Requirements
- Verify field conditions and exact quantities; request written approval for any substitutions.
- Where specific product links are provided in the Scope of Work, contractors must use the exact products referenced in those links unless a written substitution is approved bydRC prior to purchase.
- All grab bars/rails must support 350 lb+ when properly anchored; coordinate heights per OT input where available.
- Protect adjacent finishes; clean up daily; provide 1-year workmanship warranty.
- Work must comply with local building codes and aging-in-place best practices. For pre-1978 homes, EPA Lead-Safe Renovator certification and practices are required for interior work disturbing more than 2sq ft of painted surface.
- Section 3 Compliance: This project is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968. Contractors and subcontractors are encouraged to make every effort to employ low-income persons and qualified Section 3 residents and to contract with Section 3 business concerns when feasible. Documentation of outreach and hiring efforts may be requested.
How to Apply / Submit a Bid
Due by the Closing Date:
• Completed bid/cost estimate with materials and labor itemized separately
• Proof of current Virginia contractor license
• Certificate of Insurance
• Lead-Safe and other certifications (if applicable)
• Completed W-9
Submit Bids or Questions to:
Samantha Davis, CAPS
Program Manager – Older Adult Home Modification Program
disAbility Resource Center
409 Progress St., Fredericksburg, VA 22401
540-373-2559 • sdavis@cildrc.org
Award Information
All bids will be reviewed for completeness, qualifications, and compliance with HUD requirements. The contract will be awarded to the bidder whose proposal is determined to be most advantageous to the project, considering price, experience, capacity, and overall responsiveness. Contractors may be contacted for clarification before an award decision is made. Award notifications will be posted and emailed within ten (10) business days of the closing date.
No comment yet, add your voice below!